OEE is three numbers multiplied together and then reported as one. Almost everything wrong with how it gets used follows from that sentence.

01The arithmetic

Availability times performance times quality. 90 percent on each gives 73 percent overall, which sounds like a line with a modest problem. It is a line with three separate problems, each of which is losing you a tenth of the plant, and the single number tells you nothing about which one to go and look at.

02The number is not comparable

Not between plants, and often not between lines in the same plant, because the definitions move. Is planned maintenance in availability? Is a changeover? Is the ideal cycle time the machine builder's figure or the fastest you have ever actually run? Every one of those is a defensible choice and every one of them moves OEE by several points. Benchmarking against another site's number is comparing two different measurements that share a name.

03What it hides most often

Small stops. A line that stops for thirty seconds every four minutes and a line that stops for two hours once can report the same availability. They are not the same line, they do not have the same cause, and they do not have the same fix. If your system only logs stops over five minutes, it is not measuring the failure mode that is most likely to be your biggest loss.

04The speed loss nobody owns

Performance loss is the quietest of the three because the machine is running the whole time. A line held at 92 percent of rate by an upstream restriction shows green on every screen in the building. It is only visible if the ideal cycle time in the system is honest, and there is always pressure to set it to something the line can comfortably hit.

05How to use it properly

Report the three components separately and let people multiply if they want a headline. Fix the definitions once, write them down, and stop changing them. Then use OEE for what it is genuinely good at, which is trending one line against itself over time. It is a bad number for judging a plant and a very good one for telling you whether last month's fix worked.

Written by
Prital engineering
Talk to an engineer
Keep reading
Ready to optimise your production?

Tell us what the line has to do. One of our engineers will come back with how we would make it do that, and what it takes.

Talk to an engineer

Prefer to talk it through first?+39 351 479 6193

  • A named engineer, not an account manager
  • A reply usually within a working day
  • A scope written on your floor, before anyone quotes
Call usGet a quote