
An audit that tells you what to do next, and training delivered on your own equipment so that what people learn is what they will use on Monday.
An engineer replies, usually within a working day. Not a salesperson.
- Line and plant audits against OEE, safety and compliance
- Feasibility and investment studies with costed options
- Bottleneck analysis and capacity modelling
- Operator, maintenance and engineering training on your own equipment
- Machine safety assessment and CE marking support
- Second opinion on a quote or a design you have been given
Each one has an output the next one depends on. Skipping a stage does not save the time it appears to save.
- 01
Look at the line
Days on your floor across more than one shift. The line behaves differently at four in the morning and that is usually where the answer is.
- 02
Measure
Real downtime, real changeovers, real rework. Not the numbers in the report, the numbers on the machine.
- 03
Cost the options
Two or three routes with prices, timescales and the risks named. Including the option of doing nothing, priced honestly.
- 04
Train the people who stay
Your operators and maintenance team, on your equipment, with material they keep.
- Audit output
- Findings, prioritised actions, costed options, one page for the board
- Training formats
- On-line-side sessions, classroom, and train the trainer
- Subjects
- PLC and SCADA fundamentals, fault finding, safety systems, OEE practice
- Languages
- English and Italian as standard

Yes, and we will write it plainly. If the previous design is sound we will say so, which happens more often than people expect.
- 06
Industry 4.0
MES integration, line telemetry and OEE reporting: the layer that turns a working line into a line that tells you what it is doing.
Read on - 01
Industrial automation
PLC, SCADA and MES architectures that run the whole line in real time. Designed, coded and commissioned by the team that will maintain them.
Read on - 04
Line start-up assistance
Fast, supervised ramp-ups. We stay on site until the line holds its rate with your operators running it, not ours.
Read on

Tell us what the line has to do. One of our engineers will come back with how we would make it do that, and what it takes.
Prefer to talk it through first?+39 351 479 6193
- A named engineer, not an account manager
- A reply usually within a working day
- A scope written on your floor, before anyone quotes